THANK YOU ALL WHO SUPPORTED HELPED OR ATTENDED THE TEA PARTY AT THE ARUNDEL HOTEL CARLISE ROAD EASTBOURNE ON SUNDAY 17TH JANUARY 2015
THANK YOU GEORGE AND LENYA AND THE MAPOURAS FAMILY FOR LETTING US USE THEIR HOTEL
ALL THE DELICIOUS SANDWICHES SNACKS CAKES AND DESERTS WERE PREPARED AND DONATED BY
EASTBOURNE AND BRIGHTON COMMUNITY MEMBERS
THANK YOU ALSO FOR THE RAFFLE PRIZES AND FOR JOINING US
TOTAL RAISED £376 FROM THOSE ATTENDING, DONATIONS AND RAFFLE
WITH MORE DONATIONS HOPEFULLY COMING IN
PLEASE LET US KNOW IF YOU HAVE ANY FUND RAISING IDEAS OR YOU CAN HOLD AN EVENT
Following Events/Suggestions
1. Sunday 24th January 1.30pm at The Lilac~ Roast Lunch to be held by Costas Costi Cost £5 per person. Please confirm to Costas direct on 07460548618 or committee to reserve places
2. Sponsored Diary for 2017 (suggested by Maria Vounatsou (Mamouchas)) to be sponsored by local members of the Community paying for Adverts. Details will follow
FUNDS NEEDED FOR URGENT REPAIRS TO THE CHURCH INCLUDING
1) Repair of two flat roofs £1,370 work complete.
2) Plastering of Ceiling by door and side wall, patching ceiling above stairs to gallery and filling in cracks and holes left by microphones on both windows £250 by Ray Bridger
3) Guttering outside priests room and to the side of side door awaiting estimate
4) Ramps to toilet and rear door with handle bars and raising front door mat and side door mat and supplying and fitting disabled bar for toilet awaiting estimate
5) Decorating and flooring toilets
6) Fitting of 3 lights in church, fix existing sensor light and add three further Sensor lights
7) Pay contribution for prayer bench Bible holder (Psalterion) for materials as George very kindly did the work for free.
8) Repairing floor boards around church which are rotting and unsafe and repairs to door frames.
9) Applying damp proof paint to wall at front of church near the upper gallery and also rear wall of school
10) Having existing microphone fitted to school
11) If Sensible Solutions do not fix exterior wall of priest room and kitchen then we will have to repair wall and redecorate priest back room.
12) Render exterior walls were necessary supply scaffolding and fix guttering which is hanging from roof